Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Preparation - STIEBEL ELTRON DHE Connect 18/21/24 Bedienung Und Installation

Vorschau ausblenden Andere Handbücher für DHE Connect 18/21/24:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION

Commissioning

12. Commissioning

12.1 Preparation

Internal anti-scalding protection via jumper slot
Jumper position
Description
43
For example in nurseries, hospitals, etc.
50
55
Max. for shower operation
60
Factory setting
No jumper
Limited to 43 °C
f Install the jumper in the required position (= temperature in
f
°C) on the "Tmax" pin strip.
96
|DHE Connect | DHE Touch   
43°
50°
55°
60°
CAUTION Burns
If the water supplied to the appliance is preheated, the
internal anti-scalding protection and the temperature
limit that is adjustable by the user may be exceeded.
In such cases, limit the temperature with an upstream
central thermostatic valve (ZTA 3/4).
www.stiebel-eltron.com

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis