Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Appliance Handover; Returning Into Use; Settings - STIEBEL ELTRON DEM series Bedienung Und Installation

Mini-durchlauferhitzer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

.CZ`<<`.HC
HBB.ZZ.HC.C&

11. Commissioning

11.1 Commissioning
f Fill the appliance via the tap by opening the draw-off valve
several times or by triggering the sensor, until the pipework
and the appliance are free of air.
f Carry out a tightness check.
f Insert the plug on the power cable, if available, into a
suitable socket or set the fuse/MCB.
f Check the function of the appliance.
f In case of oversink installation, affix the company logo
supplied over the existing company logo.

11.2 Appliance handover

f Explain the appliance function to users and familiarise them
with its operation.
f Make users aware of potential dangers, especially the risk of
scalding.
f Hand over these instructions.
Ô
’ B

11.3 Returning into use

Damage to the appliance and environment
Following an interruption of the water supply,
recommission the appliance by carrying out the following
steps, in order to prevent the destruction of the bare wire
heating system.
f Isolate the appliance from the power supply, either
by pulling the plug of the power cable, if available,
or by removing the fuse/tripping the MCB.
f Fill the appliance via the tap by opening the draw-
off valve several times or by triggering the sensor,
until the pipework and the appliance are free of air.
f Switch the power back ON.
- See chapter "Commissioning"

11.4 Settings

You can alter the maximum flow rate and temperature.
DANGER Electrocution
The flow rate and temperature must only be adjusted with
the appliance isolated from the power supply.
f Isolate all poles of the appliance from the power
supply.
qqq Z`. <é<`VHC HB

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Dem 3Dem 4Dem 6

Inhaltsverzeichnis