Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Start-Up - STIEBEL ELTRON DHE Connect 18/21/24 Bedienung Und Installation

Vorschau ausblenden Andere Handbücher für DHE Connect 18/21/24:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION
Commissioning
Changing the connected load via the jumper slot
If you select a connected load other than the factory setting for
the "DHE Connect 18/21/24" and "DHE Touch 18/21/24", you will
need to reposition the jumper.
f Install the jumper in the required position on the "Pmax" pin
f
strip.
Jumper position Connected load
1
18 kW
2
21 kW
3
24 kW
No jumper
18 kW
www.stiebel-eltron.com 
1
2
3

12.2 Initial start-up

f Open and close all connected draw-off valves several times,
f
until all air has been purged from the pipework and the
appliance.
f Carry out a tightness check.
f
f Activate the safety switch by firmly pressing the reset button
f
(the appliance is delivered with the safety switch disabled).
In the DHE Connect 18/21/24 and DHE Touch 18/21/24 appliances,
the medium connected load (21 kW) is factory preset.
DHE Connect | DHE Touch |
≥ 60 s
97

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis