9.3.1 - Unit assembly
The unit, once it has been removed from the crate it is packed in, is transported to the point of installation and
lifted with a forklift.
Attention
It is up to the installer to use a forklift with suitable weight and lifting capacity.
The unit should always be forked and raised taking into account its centre of gravity.
Image A - Ceiling mount
9.3.2 - Instructions for ceiling installation
1. Remove package lid before lifting unit to ceiling.
2. Predispose fastening rods to ceiling.
3. Lift packaged unit to ceiling.
4. Fasten model to fastening rods.
5. Unfasten pallet's screws and slip off empty packaging.
6. Tighten fastening screws "A" of unit to ceiling.
51
www.modine.com