5.5.6.8

START-UP Voltage

The start-up voltage for both input channels can be independently adjusted (if they
have been configured independently) to suit the needs of the system. The voltage
range is from 120V to 350V. The default setting for AURORA is 200V. This
parameter may be varied by using the display keys.
5.5.6.9

Autotests

In accordance with the "guide for connection to the ENEL electrical distribution
grid", autotests can be launched through the menu on the display, or by using an
RS485/USB converter and the AURORA Communicator software (see section 5.6
for further details).
The following conditions are necessary for the Autotests to be performed:
You must have set the ENEL grid standard.
-
The inverter must be connected to the grid in a way that allows simulating
-
a disconnection condition.
Do not carry out any operation during the test execution phase.
-
Check the stability of the connection of the device to the grid.
-
Follow the procedure below in order to perform the Autotests:
-
Access the menu SETTINGS > Autotests
-
In the section of the menu dedicated to the Autotests, the type of test that
the device must start may be selected from the following:
OV = Max voltage
UV = Min voltage
OF = Max frequency
UF = Min frequency
VStart1
200V
OV test PH.R
UV test PH.R
OV test PH.S
UV test PH.S
OV test PH.T
UV test PH.T
OF test
UF test