Herunterladen Inhalt Inhalt Diese Seite drucken

Procedure Of Connection / Disconnection - Power One AURORA PVI-10.0-I-OUTD-400 Installations- Und Bedienungshandbuch

Photovoltaik-wechselrichter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Use and installation manual
(PVI-10.0/12.0-I-OUTD(-S)-400 Rev:1.3)
3.4.1

Procedure of CONNECTION / DISCONNECTION

WARNING: CAREFULLY FOLLOW THE STEPS OF THIS
PROCEDURE in order to avoid damaging property, damaging the
inverter, or injury to people. The AURORA inverter has very high
operational voltages which can be extremely dangerous if all precautions
are not observed.
WARNING: THE FOLLOWING OPERATIONS MUST ALWAYS BE
CARRIED OUT before accessing the inside of the inverter to avoid
injury to people and damage to property.
STEP 1 If the inverter is connected to the power supply grid, DISCONNECT IT
by opening the switch indicated as Part "D" in Fig. 8.
STEP 2 Carefully cover the photovoltaic panels by means of opaque material, or
perform the following operations at night. Ensure that the photovoltaic field cannot
provide energy during these operations.
STEP 2 Disconnect the DC switch by opening the integrated switch (-S models) or
the external switch.
Fig. 8 - Connection diagram
26
97
Page
of

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis