Herunterladen Inhalt Inhalt Diese Seite drucken

Connection To The Ac Grid; Connection Of Alarm Cables And Rs485 (Optional) - Power One AURORA PVI-10.0-I-OUTD-400 Installations- Und Bedienungshandbuch

Photovoltaik-wechselrichter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Use and installation manual
(PVI-10.0/12.0-I-OUTD(-S)-400 Rev:1.3)
3.4.6

Connection to the AC grid

WARNING:
connection/disconnection procedure detailed in paragraph 3.4.1.
Step 1: Remove the front cover of the inverter as shown in section 3.4.2.
Step 2: Lay down the AC cables from the inverter terminal box to the AC
disconnector.
Step 3: Pass the AC cables through one of the holes present on the bottom of the
inverter, using the cable gland supplied in the installation kit.
Step 4: Connect the 3 AC cables to the inverter terminal box, following the
serigraphy.
-
terminal for
-
terminal R for phase R,
-
terminal S for phase S,
-
terminal T for phase T,
-
terminal N for neutral,
A
3.4.7

Connection of alarm cables and RS485 (optional)

WARNING:
connection/disconnection procedure detailed in paragraph 3.4.1.
Before
carrying
ground protection
Fig. 12- Terminal Block for AC connection
Before
carrying
out
any
operation,
out
any
operation,
33
97
Page
of
follow
the
follow
the

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis