Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch Start Line TCE 420 Instandsetzungsanleitung Seite 27

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.2
Tighten the nuts on equipment at
regular intervals
Do the below operation at least every 30 days:
Tighten the bolts to fix the turntable.
Tighten the bolts to fix the clamps.
Tighten the bolts to fix the slider.
Tighten the bolts near the bead break cylinder.
Robert Bosch GmbH
Maintenance routine | Start Line TCE 420 | 27
3.3
Clean the silencer on pedal valves
at regular intervals
DANGER
Cut off the air source before operation.
Exhaust the rest air in equipment by step the
pedal of bead break cylinder repeatedly.
1. Remove the side panel.
2. Adjust the silencer A and B on air valves Or clean it
by high pressure gas.
i
If silencer is damaged then replace it.
en
|
1 695 108 084
2016-11-15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis