Herunterladen Inhalt Inhalt Diese Seite drucken

EKOM DUO 2V Anleitung Zur Installation, Bedienung Und Wartung Seite 36

Vorschau ausblenden Andere Handbücher für DUO 2V:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 69
9.2.
Suction pump control connection
(Fig.9)
Lace the cord (12) of aspirator control (24V AC/DC) through the hole in the rear part of the casing (1) (Fig.9-
C2) or via the piping in a floor (11)(Fig.9-C3), fix with clips (2) located on the left panel of the casing in its
bottom part and lead it via a hollow (3) in the front part of the casin (Fig.9-A). Prior to putting the cord into
clips it is necessary to move the sound insulation material (4) in the corners of the casing. Remove the cover
of an electric distribution channel (5) and cover of electric panel (6). Connect the cord for aspiration control
to the terminal of printed circuit board according to the wiring diagram, insert it to the hollow (3) in the front
part of the casing, behind the sound insulation material at the side of the casing (4) and to the electric
distribution channel (7) (Fig.9-B).
Electrical cable may not contact the hot parts of a compressor. Insulation could be
damaged!
A
3
2
C
C
Fig.9
NP-DUO-4_11-2015-MD
4
12
- 34 -
B
12
3
C1
C1
C2
C2
C3
C3
7
DUO
5
11/2015

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Duo 2Duo

Inhaltsverzeichnis