Herunterladen Inhalt Inhalt Diese Seite drucken

Textron Jacobsen Tri-King Sicherheits-, Betriebs- Und Wartungshandbuch Seite 27

Triplex mower with rops
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

How to calculate a slope:
Tools Required:
Level (A), either 1 yard, or 1 meter long.
Tape measure (B).
With the level (A) positioned horizontally, measure the
distance (C) with tape measure (B). Use the chart to
calculate either the slope angle or the % grade of the
slope (D).
Inches with 1 Yard Level (A)
3
6
7.5
9
10
11
12
13
14
15
16
18
20
25
30
36
Height (C)
Millimeters with 1 Meter Level (A)
100
150
200
225
250
275
300
325
350
375
400
425
475
500
600
800
900
1000
OPERATION
B
A
C
D
Result (D)
Slope in Degrees
4.8
5.7
8.5
9.5
11.3
11.8
12.7
14
15.4
15.5
16.7
17.0
18.0
18.4
19.3
19.9
20.6
21.3
21.8
22.6
23.0
24
25.4
26.6
29.1
31.0
34.8
38.7
39.8
42.0
45.0
6
Figure 6E
Slope Grade
8.3
10.0
15
16.7
20.0
20.8
22.5
25.0
27.5
27.8
30.0
30.6
32.5
33.3
35.0
36.1
37.5
38.9
40.0
41.7
42.5
44.4
47.5
50.0
55.6
60.0
69.4
80.0
83.3
90
100
27

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Textron Jacobsen Tri-King

Inhaltsverzeichnis