Herunterladen Inhalt Inhalt Diese Seite drucken

P) Installing The Receiver And The Receiver Power Supply - Reely Piper Cherokee Bedienungsanleitung

Gp flugmodell
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Use a marker to mark the position where the linkage needs to be angled off.
At this point create a Z bend and suspend the linkage in the rudder horn (2).
Shorten the linkage leaving an excess of 5 mm.
Important:
Make sure that the elevator is in neutral and the servo lever is
assembled at exactly 90° degrees.
Follow the same procedure for the rudder linkage of the rudder.
Screw a fork head (3) on the gas linkage (1) and the steering rod of the bow
landing gear (2) in such a way that the linkage is level with the fork head.
Suspend the fork head in the corresponding rudder horn.
Important:
Make sure that the bow landing gear is in neutral (the carburettor
is at half-throttle) and the servo lever is assembled at exactly 90°
degrees.

p) Installing the Receiver and the Receiver Power Supply

Cut the three layers of foam as shown in the illustration and put the receiver (1)
and receiver battery (2) between these layers.
Connect all the servos to the corresponding outlets and stow the package
beneath the servo tray.
Tip: Use an extension cord to connect the aileron servo. This means you will be
able to keep the receiver housed in the foam at all times.
48
Figure 45
Figure 46
Figure 47

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis