Herunterladen Inhalt Inhalt Diese Seite drucken

Transportation And Commissioning; Transportation By Crane - Jungheinrich EFG-Vac 25 Betriebsanleitung

Elektro-fahrersitzgabelstapler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

C Transportation and commissioning
1

Transportation by crane

m
Only lifting gear of adequate capacity
must be used
(loading weight = own weight + battery
weight; see identification plate of the
truck).
–– Safe parking of the truck
(refer to chapter E)
–– Fasten hoisting gear at lifting mast
crossbeam (1) and at trailer coupling
(2).
m
Transporting by crane is only provided
for transport for first commissioning.
For application conditions that require
frequent shipment (changing usage
locations) it is required to consult the
manufacturer.
m
Hoisting belts or chains may only be
hooked into the top lug of the
counterweight and the lugs of the end
crosshead (lifting mast).
The lifting mast must be fully tilted back.
The hoisting belt or chain at the mast
must have a minimum free length of
2 m.
m
The crane hoisting gear must be
attached in such a way that it cannot
touch any attached components or the
overhead guard during lifting.
1
2
C 1

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis