Herunterladen Inhalt Inhalt Diese Seite drucken

Motor Connection - Lenze 8200 vector Montageanleitung

15 ... 90 kw
Vorschau ausblenden Andere Handbücher für 8200 vector:
Inhaltsverzeichnis

Werbung

5.5.4

Motor connection

PE
U
T1
T2
V
W
PES
PES
PES
PES
PE
PES
J>
PES
M
PE
3~
PTC
PES
M
PE
3~
Cable cross−sections U, V, W, PE
8200 vector
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
E82EV753K4B
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
E82EV903K4B
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
EDK82EV903 DE/EN/FR 4.0
Standard devices in the power range 75 ... 90 kW
T1
2.5 Nm
T2
22.1 lb-in
T1
T2
M 10
U, V, W,
PE
30 Nm
PE
264 lb-in
PE
U
V
W
M4 × 12
2,5 Nm/22.1
M5 × 12
3 Nm/26.5
0
Strain relief with cable clamps and screws M4 × 12 mm.
1
Place the shield of the motor cables with shield clamp and M5 × 12 mm screws onto the shield
sheet.
2
Strain relief with cable binders.
Use low−capacitance motor cables! (Core/core £ 250 pF/m, core/shield £ 410 pF/m)
The shorter the motor cable, the better the drive behaviour!
PES
HF shield termination by PE connection through shield clamp.
T1,
Terminals of motor temperature monitoring with PTC thermistor or thermal contact (NC
T2
contact).
Lay a separate cable (shielded) to X2/T1 and X2/T2 for motor temperature monitoring.
Activate motor temperature monitoring with C0119 (e.g. C0119 = 1)!
Lay the control and mains cables separately from the motor cable!
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ
l
Electrical installation
Motor connection
0
1
2
lb-in
lb-in
2
mm
70
95
5
8200vec287
AWG
2 / 0
3 / 0
161

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis