Herunterladen Diese Seite drucken

ECOLAB EcoPro Kurz- Betriebsanleitung Seite 70

Vorschau ausblenden Andere Handbücher für EcoPro:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Start-up and control
EcoAdd
1.
Press for 2 seconds.
2.
Select language:
Ä Chapter 5.3.1 'Language selection on initial start-up' on page 29
3.
When starting up the pump for the first time, vent the air.
EcoAdd operating instructions (MAN046939)
Initial use and start-upÜ Venting the metering pump
4.
Perform pump calibration
EcoAdd operating instructions (MAN046939)
Initial use and start-up Ü Calibration on initial start-up
5.
Set the operating mode
EcoAdd operating instructions (MAN046939)
Controls/software Ü Operating mode
All relevant operating instructions are always kept up to date and are available
on the Internet, where they can be downloaded for free.
instructions' on page 3
5.2
Venting the metering pump
CAUTION!
Particular caution is required when handling chemical metering media.
Metering media can escape, which can cause skin irritation, depending on their
properties. Therefore, before venting, always read the product data sheet of
the metering medium to prevent any type of injury.
1.
Open the vent screw by approximately 1 turn.
2.
Keep a suitable collecting basin under the air bleed connection.
Ä Chapter 3 'Structure' on page 13 .)
(See
3.
Press the Test button
connection.
4.
Keep the Test button
completely with the product.
5.
Close the vent screw again.
6.
Press the Test button
metering line up to approximately 2 cm in front of the injection valve.
10240750 Ver. 5-12.2023
All entries/settings are made via the "touch-sensitive screen" (see the
EcoAdd operating instructions (MAN046939)).
until the metering medium is discharged from the air bleed
pressed for a further 60 seconds so that the pump head fills
again until the metering medium visibly passes through the
Repeat the venting process if no metering medium enters the metering
line.
28
Ä
'Available

Werbung

loading

Diese Anleitung auch für:

EcoupEcoadd