Herunterladen Inhalt Inhalt Diese Seite drucken

Example For Creating A Program; Performing An Emergency Program - Knauer Smartline Pump 1000 Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Programming the Smartline Pump 1000
Fig. 18

Example for creating a program

SOP 17
Load
Edit Prog
Prog
Clear 0
Link
07
30
WAKE
View
OFF
Hold 0
Run 1
Display of Wake-Up program
5.
Execution of Wake-Up Program can be aborted by entering the
number of another program.
Generation of program no. 7 with the following functions: Constant ow
rate of 100.0 ml/min. Linear gradient changing composition from 90 % A
and 10 % B at start time to 10 % A and 90 % B at time 20 minutes.
This program is based on the configuration described in the section
"Operating the Smartline Pump 1000" on page 17. This setup must be
performed before program definition. Remember, underscored characters
indicate that the corresponding parameter is continuously calculated.
1.
Go to the main menu screen.
2.
Move the cursor to the Edit Prog field and press 7 to create
program no. 7.
3.
Press the
key to enter the Edit mode for the new program.
The cursor is positioned at Time 000.0.
4.
Press the
key to set the flow rate: Press 1, 0, 0 and then the
key to enter the value 100.0 ml/min. The display should look like
part A Fig. 17 and the cursor should be blinking in the TIME field.
5.
Press the
key to go to the % A field, then press 9 and 0 and the
key to confirm the input. The amount for % B is automatically
calculated and will be indicated as 10 %. The display should now
look like part B in Fig. 17 on page 23.
6.
Now press the
define a new time step. The display now should look like part C in
Fig. 17 and the cursor should blink on the first asterisk.
7.
Now press 2 and 0 and then
as to enter field % A.
8.
Press 1 and 0 for 10 % A and then the
The amount for % B is automatically calculated and indicated as 90
%. Enter now at the end a flow rate of 1 ml/min again. The display
now should look like part D in Fig. 17.
After loading, the program can be executed (see SOP 14).

Performing an emergency program

The running of an emergency program is recommendable when the
pump is to run for longer periods of time, for example, when the pump is
to run unsupervised overnight. An emergency program could be written
such that when an ERROR signal is given out by the pump, the
emergency program would then shut off the pump.
This SOP applies to the Smartline Pump 1000 Firmware Version 1.0X or
higher.
Flow
Pressure Events
[ml/min]
[0.1 Mpa] off 0
P:01
at : 09 . 15
UP
on:
13 . 06 . 98
Time
%A
%B
[min]
key again to create the next program line and
to define time step 20.0 min as well
on 1
2
Setup
GLP
%C
%D
key to confirm the input.
25

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis