Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 93

Unpacking

During unpacking, check that the components are in
good condition and tally with the number stated; in the
event of damage, report the damage to the retailer or
directly to the manufacturer within 8 days of receiving
the machine.
Fitting the upper point of the three-point hitch
Carry out the operations described.
1) Position the upper three-point hitch
(A).
2) Tighten the bolts (B).
3) Tighten the bolts on the opposite
side.
4) Position the tie rod (C) as shown in
the figure.
5) Tighten the bolt (D).
6) Tighten the bolt (E).
7) Repeat the same procedure to fit the
other link pin.
Fitting the conveyor
Carry out the operations described.
1) Position the conveyor (A).
2) Tighten the nuts (B).
3) Tighten the nuts on the opposite side
of the conveyor.
English language
INFORMATION CONCERNING HANDLING AND INSTALLATION
UN41-0815LR
UN41-0816LR
The packing materials must be appropriately disposed
of or recycled in accordance with the laws in force.
C
E
A
9
4
D
A
B
B
Use and maintenance

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sp 150 onionSp 160 onion

Inhaltsverzeichnis