Herunterladen Inhalt Inhalt Diese Seite drucken

Checchi & Magli SP onion-Serie Bedienungs- Und Wartungsanleitung Seite 48

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 93
4)
Loosen the sprocket (E) to de-tension the transmis-
sion chain.
5)
Loosen the nut (D).
6)
Adjust the sprocket (F) using the stud bolt (G).
The rod conveyor must fit perfectly against the roll-
ers (H).
7)
Tighten the nut (D).
8)
Repeat the same procedure to adjust the position
of the sprocket at the opposite end.
9)
Tension the drive chain (see "Adjusting the trans-
mission chain tension").
10) Position the fixed casing (C).
11) Tighten the screw (B).
12) Tighten the screws (A).
Adjusting digging shaft chain tension
NOTICE
Do not overtighten the chain as this
could cause premature wear of the
chain and the sprockets.
Carry out the operations described.
1) Loosen the screws (A).
2) Unscrew the screw (B).
3) Remove the fixed casing (C).
4) Loosen the sprocket (D).
5) Adjust the sprocket until you reach
the sag value (F) shown in the figure.
6) Tighten the sprocket (D).
7) Position the fixed casing (C).
8) Tighten the screw (B).
9) Tighten the screws (A).
English language
ADJUSTMENT INFORMATION
NOTICE
The adjustment must be performed in exactly the
same way on both sides of the machine to prevent the
rod conveyor moving sideways during operation.
Check for any sideways movement when the rod con-
veyor is moving.
If the rod conveyor moves sideways, repeat the ten-
sioning procedure.
F (10 - 15 mm)
A
UN41-0825LR
14
5
D
B
C
Use and maintenance

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sp 150 onionSp 160 onion

Inhaltsverzeichnis