BNI IOF-329-P02-Z038
Safe I/O Module, Safety over IO-Link
IP67 Module
14
Check lists for startup and projecting
14.1 Installation
88
english
The following checklists can be used to check the startup and projecting. We recommend
keeping these checklists with the machine documentation so that the startup and projecting
process can also be verified at a later time.
Step
Functional ground connection
made?
Actuators and sensors
connected?
Dummy plugs placed on unused
ports?
IO-Link connection between safe
I/O module and IO-Link master
established?
PELV power supply used for
supply voltage and connected?
See
Done?
section
yes
no
5
5
5
5
5
Checked by / Date
Remarks