Herunterladen Diese Seite drucken

Knauer Smartlibe UV Detector 2500 Handbuch Seite 18

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating the UV-Detector 2500
Fig. 13
SOP 2
Fig. 14
1
Installing the flow cell
Installation of the Flow Cell (fiber optics)
This instruction refers to the UV-Detector 2500 with fiber optical
connectors.
Installing the fiber optics flow cell
1. Loosen and remove the two fiber optical cables (1) connected to the
flow cell (2).
2. Remove the cell.
3. Take an other flow cell.
4. Connect the fiber optical cables with the flow cell and tighten them
manually. Please do not tighten them too much.
3
2
4
2
1
17

Werbung

loading