Warning: During kart operation beware of any contact of body or clothing with moving
Fig. 6
6.2. Direct attachment of the engine on chassis
If the frame of the chassis is specially prepared for installation of the Rotax 125 MAX DD2 then 2
sheet metal brackets with holes are welded on to the two frame tubes. Between the two brackets
the engine is clamped with 4 bolts.
Note:
Note:
Warning: For engine suspension to the chassis pleas follow the instruction of the
7. Fitting of the start button and of ON/OFF switch
Both items have to be fitted either right or left into top section
of the front shield where the best possible protection against
dampness is provided.
Seite/page 61/100
Downloaded from
www.Manualslib.com
Operating Instructions 125 MAX DD2
parts of the kart (rear axle, brakes, wheels...). Risk of injury.
Mount engine directly on the brackets
Alignment of engine is not necessary, this is done automatically by the two brackets.
Engaged thread length in crankcase should be between16 – 24 mm (0,6 – 0,95 in)
chassis manufacturer.
Drill 22 mm (0,86 in) dia. hole for the
starter button (2) into either left or right
side of front shield
Approx. 40 mm (1,6 in) below drill a 10
mm (0,4 in) dia. hole for the ON/OFF
switch (1).
manuals search engine
Fig. 7
Ausgabe/edition 01/2006