Herunterladen Inhalt Inhalt Diese Seite drucken

Sartorius Stedim Biotech BioWelder Total Containment TC 2000 Bedienungsanleitung Seite 17

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 47
4 . Start welding sequence
Check on the touch screen whether the type of tube entered matches with the
type of tube inserted. Check inside and outside diameter as well. If all specifica-
tions match, press the start button to start the welding sequence.
The welding is finished when the cover opens . Afterwards proceed as follows:
1 . Remove blade with the blade remover tool (ref to Chapter 5 .8 Blade handling)
The blade cooling remains switched on until the blade is removed by the user
or the after-cooling time of two minutes have elapsed.
Each blade may only be used once.
2 . Remove tubes from the holder
If the welding seam sticks together, pinch it gently to open up .
3 . Check quality of welding
For an optimal connection, let the tube cool for about one minute before
checking the welding and before the thermal weld is mechanically loaded.
4 . Dispose of waste tube appropriately
The welding is now finished and a new welding sequence can be started.
Start-up
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis