Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions; Control Cabinet Installation - Bosch Servodyn-ASC Betriebshandbuch

Steuerkarte
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1.5 Installation
Instructions
1.6 Control Cabinet
Installation
1070066022 - 101
– Install BOSCH ASC stationary and ground.
– Take into consideration the minimum distance surrounding elements
when positioning the inverter. (see enclosed cabinet)
- Rack units are designed for vertical installation and can be aligned next
to each other. Maintain a distance of at least 50mm to the elements
stored in front. Make sure cooling is sufficient.
– No mist or water may get into the BOSCH ASC.
– Prevent dust from getting into the BOSCH ASC.
When installing a dust-proof housing make sure it has enough heat
dissipation.
– Do not operate BOSCH ASC in an explosion-protected room! In
explosion-protected rooms the BOSCH ASC must be installed in an
explosion protected housing, in observance of the local regulations.
– Protect BOSCH ASC against conductive and aggressive gases and
liquids.
– Informations for correct installalation see EMC-handbook, part no.
1070066073.
Consumers, which produce electrical or magnetic fields or have an
influence on the voltage supply, must be placed as far away as possible
and measures must be taken to suppress the influences.
Direction of cooling fins
KEB
COMBIVERT/
COMBIDRIVE
Cool air inlet
Servodyn - ASC
150
F4
F4
100
Minimum distances
Warm air
outlet
General
GB
30
GB - 9

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis