Herunterladen Inhalt Inhalt Diese Seite drucken

Declaration Of Conformity - Xylem FLYGT Compit 901 Installation

Pumpstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Pump manual
The safety information in the Installation, Operation and Maintenance manual for the pump must be followed at
all times.
Ground continuity verification
A ground (earth) continuity test must always be performed after service.
6.1.1 Inspect the work area before permit-required hot work
WARNING: Explosion/Fire Hazard
Before starting any permit-required hot work such as welding, gas cutting,
grinding, or using electrical handtools, do the following: 1. Check the explo-
sion risk. 2. Provide sufficient ventilation.
6.2 Maintenance guidelines
• A yearly inspection and cleaning of level regulators is recommended.
• Make sure that the inside of the tank, valves, and pipes are kept as clean as possible.
• Always close and lock the access cover before leaving the unit.
6.3 Replace the check valve
If the check valve must be replaced, then contact an authorized service representative.
DN32
The pump station is a confined space. Do not enter it. For more information on confined spaces, see
spaces
on page 5.

7 Declaration of Conformity

7.1 Declaration of Conformity
Xylem Water Solutions Global Services AB Emmaboda hereby certifies that Flygt Compit 901 pump station with
an incorporated Xylem pump has been manufactured in accordance with the COUNCIL'S DIRECTIVE concern-
ing convergence of the legislation of Member States with regard to Machinery 2006/42/EC, EMC 2014/30/EU,
Low Voltage 2014/35/EU. Marked with serial number.
The product has been manufactured in accordance with the following harmonized standards and technical spec-
ifications:
en - Original instructions
DN50
Confined
41

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis