Herunterladen Inhalt Inhalt Diese Seite drucken

Xylem FLYGT Compit 901 Installation Seite 12

Pumpstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

en - Original instructions
1
2
3
4
3. Raise the lifting hook until the lifting sling is taut.
4. Cut the straps which secure the pump station to the pallet.
5. Lift the unit straight up.
The unit may jolt or sway near the end of the lifting operation.
Make sure that the concrete cover stays on the pallet.
6. Put the unit on the ground in a horizontal position.
7. Attach a sling to the lifting eye.
12
1. Lifting sling
2. Pump station outlet
3. Pump station lifting eye
4. Strap securing pump station to pallet
WS011556C

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis