Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly Of Msh Basic-Fubo-Gk-Sr4 (Basic Unit) - Hauff-Technik MSH Basic-MBK-R4 Montageanweisung

Vorschau ausblenden Andere Handbücher für MSH Basic-MBK-R4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Building package MSH Basic-FUBO-GK-SR4 / MBK-R4

13 Assembly of MSH Basic-FUBO-GK-SR4 (basic unit)

Position the pre-assembled water barrier flange on the
1
installation fixture approx. 15 cm from the edge of the pipe.
Then snap the adjustable installation fixture into place in
the basic unit (see fig.: 2 and fig.: 3)..
After this, fit the MSH Basic-FUBO-GK-SR4 (basic unit) and
2
installation fixture together and fix with the wing screw
(see fig.: 4).
Longitudinally align the MSH Basic-FUBO-GK-SR4 (basic
3
unit) with the installation fixture based on the placement
on the batter board and position. Align the basic unit level
with the spirit level and insert into the ground (see fig.: 5).
The precise height is not yet important.
Legend for fig.: 5
1
Inner side of wall incl. plasterwork 5 cm
2
Level
IMPORTANT!
Failure to seal due to incorrect installation!!
Improper installation can result in damage.
• The MSH Basic-FUBO-GK-SR4 must be arranged parallel to the wall.
• Minimum space between inside of wall (finished, plastered wall) to outer side of basic
unit: 5 cm.
• The basic unit must not be covered by the inner walls later (shell wall + plaster).
• When positioning the multiple-service building entry, care must be taken to ensure that
the installation fixture does not hinder the empty conduit route (spiral hose KES).
• The position of the MSH Basic-FUBO-GK-SR4 must be agreed upon with energy suppliers!
Art. Nr.: 5090032089
Rev.: 01/2018-07-05
EN
Fig.: 2
Fig.: 3
Fig.: 4
1
2
Fig.: 5
27

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Msh basic-fubo-gk-sr4

Inhaltsverzeichnis