Herunterladen Inhalt Inhalt Diese Seite drucken

Hauff-Technik MSH Basic-MBK-R4 Montageanweisung Seite 31

Vorschau ausblenden Andere Handbücher für MSH Basic-MBK-R4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Building package MSH Basic-FUBO-GK-SR4 / MBK-R4
After fixing the height of the MSH Basic-FUBO-GK-SR4
10
(basic unit) and while filling with sand, the level provided
on the cap can be used to align the position (see fig.: 16).
IMPORTANT!
No sealing due to incorrect preparation of
installation!
Incorrect preparation can result in damage.
• While filling with sand, check the spacing from
the batter board and the vertical position of the
component and adjust as necessary.
• Spacing between inner wall side and outside of
basic unit: 5 cm.
Positioned and stable MSH Basic-FUBO-GK-SR4 mounted
vertically, aligned with the batter board and filled with
sand (see fig.: 17).
IMPORTANT!
No sealing due to incorrect preparation of installation!
Incorrect preparation can result in damage.
• The upper edge of the finished floor always has to be above the red marking.
• In buildings without a floor structure the red frame corresponds to the upper edge of the
unfinished floor. The basic unit is shortened by removing the individual compensation
frames; this is only possible up to the red marking (the compensation frame with the
red marking may not be removed). Later reworking is not applicable if the upper edge
of the basic unit is aligned with the upper edge of the finished floor.
Concreted basic unit MSH Basic-FUBO-GK-SR4 (see fig.: 18).
Legend for fig.: 18
1
Finished floor height
Art. Nr.: 5090032089
Rev.: 01/2018-07-05
1
EN
Fig.: 16
Fig.: 17
Fig.: 18
31

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Msh basic-fubo-gk-sr4

Inhaltsverzeichnis