Herunterladen Inhalt Inhalt Diese Seite drucken

Hauff-Technik MSH Basic-MBK-R4 Montageanweisung Seite 28

Vorschau ausblenden Andere Handbücher für MSH Basic-MBK-R4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Building package MSH Basic-FUBO-GK-SR4 / MBK-R4
Then release wing screws, hold onto ground spike and
4
remove MSH Basic-FUBO-GK-SR4.
Insert the included impact screw into the ground spike
and fasten with the wing screw (see fig.: 6).
Strike the ground spike into the ground by approx. 300 mm
5
or until sufficiently fastened.
Remove impact screw again (see fig.: 7).
Place MSH Basic-FUBO-GK-SR4 (basic unit) on spike that
6
has been driven into the ground.
Then align the "Upper edge unfinished floor height"
marking (sticker on the MSH Basic-FUBO-GK-SR4) par-
allel and in terms of height with the batter board (unfin-
ished floor height).
After the height adjustment, fix the wing screw to fasten
the construction (see fig.: 8).
When attached to the installation fixture, the MSH
Basic-FUBO-GK-SR4 does not yet have absolute stability.
Before starting to connect the KES hose systems as
described in Section 7, the MSH Basic-FUBO-GK-SR4
must first be secured from tipping on site.
28
Art. Nr.: 5090032089
Rev.: 01/2018-07-05
EN
Fig.: 6
Fig.: 7
Fig.: 8

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Msh basic-fubo-gk-sr4

Inhaltsverzeichnis