3 Re-tighten the star knob screw (E) on both sides.
4 Perform cutting as described.
Replacing the diamond cutting wheel (Fig. 10- 12)
Attention! Pull out the mains plug
1. Unscrew the screw (F) and remove the cutting
wheel guard (9). (Fig.10)
2. Attach the Allen key (19) to the motor shaft and
hold.
3. Use the spanner (20) to unscrew the flange nuts in
the direction in which the cutting wheel (10) runs.
(Left-handed thread)
4. Remove the outer flange (21) and the cutting
wheel (10).
5. Clean the holding flange carefully before installing
the new cutting wheel.
6. Insert the new cutting wheel in the reverse se-
quence and tighten. Attention: Ensure that the
cutting wheel runs in the correct direction!
7. Re-install the cutting wheel guard (9).
Setting the parallel position of the diamond cut-
ting disc (Fig. 13-15)
If the cut is not straight or the tile breaks along the
cutting line, the parallel position of the diamond cut-
ting disc must be set.
1. At the beginning, the stop rail must be positioned
square to the guide rail. For this, loosen the Allen
screws (A) along the stop rail and align it square
with a carpenter's square or a large tile. In this
step, the diamond cutting disc must run along the
entire length of the square or the tile edge. After-
wards, re-tighten the two stop rail Allen screws
(A).
2. Disassemble the length display by removing the
two Phillips screws (B). (Fig. 16)
3. Disassemble the cable retainers (C). (Fig. 17)
4. Slightly loosen two hexagon nuts (D) on each of
the saw unit sides. (Fig. 18, 19)
5. Now the entire saw unit with diamond cutting disc
can be aligned to the stop rail using a carpenter's
square or a large tile. (Fig. 20)
6. Re-tighten the saw unit's hexagon nuts and as-
semble all machine components. Check it is par-
allel and carry out a test cut.
If the test cut is not satisfactory, repeat steps 1-6.

Electric connection

Check electric cables regularly for damage. Ensure
that during the check, the connecting cable is not
connected to the mains.
Electric connecting cables must conform to the com-
mon VDE- and DIN provisions. Only use connecting
cables with the H 07 RN designation.
Keeping a copy of the type designation on the con-
necting cable is a specification
26 | GB
 www.scheppach.com /  service@scheppach.com /  +(49)-08223-4002-99 /  +(49)-08223-4002-58
Damaged electric connecting cables
Insulation damages frequently occur on electric con-
necting cables. The reasons are:
• Pressure points, if connecting cables are routed
through window or door gaps.
• Kinks due to improper mounting or routing of con-
necting cables.
• Intersections due to overruns of connecting cables.
• Insulation damage due to pulling out from wall
sockets.
• Cracks due to ageing of insulation.
Such damaged electric connecting cables should not
be used and can be fatal because of the insulation
damage
AC motor 230 V/ 50 Hz
Mains voltage 230 Volt / 50 Hz.
Mains connection and extension cable must have
3-wires = P + N + SL. - (1/N/PE).
Extension cables must have a minimum cross-sec-
tion of 1.5 mm².
The mains connection is secured with a max. 16A
fuse.
Start-up of the leakage current circuit-breaker:
• The function should be checked before each start-
up and at regular Intervals (min. once every week).
• If the leakage current circuit-breaker does not
switch off properly during this test, there is no per-
sonal protection! The device must therefore be
switched off immediately!
• In case of damages caused by the non-observation
of this operating instructions manual, all warranty
claims will become null and void. We do not accept
any liability for consequential damages.
• Check the product for damage before each use! If
you detect a damage, do not connect the product to
the mains power supply!
• After actuating the orange Reset button, the device
is ready for operation. Before operation, please test
the triggering with the help of the Test button (as
described in "Operation").
• Insert the leakage current circuit-breaker into the
socket.
• Press the orange Reset button.
• A red symbol is displayed in the window indicating
operational readiness.
• Press the red Test button. This action simulates a
leakage current.
• If the machine is working properly, the circuit-break-
er will disconnect the load from the mains. This is
displayed in the window through the disappearance
of the red symbol.
• Protection of man and animal is effective only if the
machine works properly.
• The Reset button must be pressed a second time
for operation.
• The load can now be inserted.