Herunterladen Inhalt Inhalt Diese Seite drucken

Activating The Device - Steca Grid 20000 Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
5. Press "
" to confirm.
6. Use the "▼" and "▲" keys to select the desired menu language.
7. Press "
" to confirm.
The menu switches to the language selected.
The display will be empty at first.
8. Press "ESC" to return to the menu.

5.3 Activating the Device

Verify that the device is connected to line voltage. If not, insert the external power fuse or turn
on the circuit breaker.
Set the DC isolating switch on the inverter to the ON position.
Provided that the solar modules are exposed to sufficient sunlight and that there are no errors or
failures, the device undergoes the following sequence of operations which you can follow on the
display of the control panel:
Self-test:
 All status LEDs are lit for approx. 6 seconds
The initialization cycle is started:
 The "Ready" status LED is flashing
Display:
 PAC
 UAC
 UDC
 State
Figure No. 14
30
Feed power in watts (W)
Line voltage in volts (V)
Solar cell voltage in volts (V)
Initializing
Initializing display
748.508 | Z01 | 2013-06-10

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Grid 23000

Inhaltsverzeichnis