Installation

4.1 Unpacking the Inverter

The inverters are loaded at their head and packed upside down facilitate transport. You will there-
fore see the bottom side of the device (connectors) after having opened the package. Take the
device at the two holding grips that are visible on the side and remove it from the packaging. When
being unpacked, the device keeps the packaging grid locked in place on its housing. The packag-
ing grid can be used to deposit the device on the floor. This prevents the cover from being dam-
aged.
Figure No. 6

4.2 Assembly Site Requirements

The inverter is provided with mere convection cooling and is therefore designed for attachment to a
vertical wall. The device is attached by means of a self-centering wall-mounting plate.
To prevent accidents when installing and servicing, free and safe ac-
cess to the devices must be ensured.
WARNING
The assembly site must be shaded.
The device may only be mounted in a vertical position.
For the assembly is to choose a solid wall or metal construction, which comply the fire-
protection class F30 and the load capacity of 40kg per unit. Relevant provisions of con-
struction regulations must be observed!
Mount the device at an appropriate distance from combustible materials.
We recommend that you mount the device at eye level to ensure optimum user comfort.