support@nextlevelracing.com
08
Align the Left and Right Vertical Post assemblies with the T-Nuts previously installed in Step 01 and
02. Bolt through and secure with 8 x M8 Bolts and Washers.
(T-Nuts Locations)
09
Install 1 x T-Nuts into the centre and rear inside channels of each Vertical Post and slide to the marked
locations.
)
A
Repeat
on Other
Side
10
A) Install a Felt Pads onto the Wheel Plate as shown. Repeat on the other side.
B) Align the Wheel Plate with the T-Nuts installed in Step 09. Bolt through and secure with 4 x M8 Bolts and Washers.
PARTS:
• • 8 x M8 20mm Bolts
• • 8 x M8 Washers
PARTS:
• • 4 x T-Nuts
PARTS:
• • 1 x Wheel Plate
• • 4 x M8 16mm Bolts
)
B
• • 4 x M8 Washers
• • 2 x Felt Pads (90mm x 10mm)
Note: Use level provided. Wheel plate
must be kept flat and level during installation
to avoid skewing.
16
Loosen the Bolts securing the Wheel Plate to the Left and Right Upright. Adjust to desired position and tighten
11
the Bolts to lock in place. Loosen the Bolts securing the Upright Plates to the Left and Right Base Frames. Adjust
to desired position and tighten the Bolts to lock in place.
(RIGHT)
(LEFT)
12
Install 4 x T-Nuts into the top channel and 1 x T-Nut into the lower inner channel of each Pedal Arm.
Install 4 x T-Nuts into the top channel and 1 x T-Nut into the lower inner channel of each Pedal Arm.
13
Install 2 x T-Nuts into the front channels of the Left and Right Vertical Posts.
17
Video Instruction: bit.ly/nlrbuild
PARTS:
• • NIL
PARTS:
T-Nut Locations
• • 10 x T-Nuts
(SIDE)
• • 2 x Pedal Arms
PARTS:
• • 4 x T-Nuts