support@nextlevelracing.com
A)
B)
(OTHER SIDE)
A) Install 2 x T-Nuts into the front and rear channels of the Shifter Arm Support and slide to the marked locations.
50
B) Install 1 x T-Nut into both channels on the inner and outer side and slide to the marked locations. Install 2 x End Caps.
C) Align the mounting holes on the Shifter Arm Brackets with the T-Nuts. Bolt through and secure with 4 x M8 Bolts and Washers.
A)
B)
51
A) Align the mounting holes on the Shifter Arm Brackets with the T-Nuts previously installed in Step 48.
B) Bolt through and secure with 4 x M8 Bolts and Washers.
A)
52
A) Align the bottom mounting holes on the Shifter Plate with the T-Nuts previously installed in Step 50.
B) Bolt through and secure with 4 x M8 Bolts and Washers.
30
PARTS:
• • 1 x Shifter Arm Support
C)
• • 2 x End Caps (40 x 80 Angled)
• • 2 x Shifter Arm Brackets
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
• • 8 x T-Nuts
PARTS:
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
PARTS:
• • 1 x Shifter Plate
B)
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
DIRECT SHIFTER ADJUSTMENT
53
Loosen the bolts securing the Shifter Arm Brackets to the Shifter Arm and Shifter Arm Support. Adjust
to desired height and distance. Tighten the Bolts to lock in place.
Note: Toolkit Holder may
be placed anywhere on the
cockpit for convinience.
)
A
54
A) Install 2 x T-Nuts into the outer-rear and middle channels of the Vertical Post.
B) Align the Toolkit Holder with the T-Nuts. Bolt through and secure with 2 x M8 Bolts and Nylon Washers.
C) Insert Toolkit into Toolkit Holder.
55
Direct Shifter Mount is complete. Please return to Step 43.
Video Instruction: bit.ly/nlrbuild
PARTS:
• • NIL
(Bolts to Loosen)
PARTS:
)
B
• • 1 x Toolkit Holder
• • 2 x M8 16mm Bolts
)
C
• • 2 x M8 Nylon Washers
• • 2 x T-Nuts
PARTS:
• • NIL
31