support@nextlevelracing.com
(T-NUT POSITIONS)
102
Install 2 x T-Nuts into the bottom channel of the Rear Base Member and slide to the marked locations.
A)
103
A) Align the threaded holes on the Rear Base Member with the through holes on the Left and Right Base Members (Circled).
B) Bolt through and secure with 6 x M8 Bolts and Washers.
(Part may vary)
104
Align the mounting holes on the Motion Plus Pivot Bar with the T-Nuts installed in Step 01, 02 and
102. Bolt through and secure with 4 x M8 Bolts and Washers (Included with Motion Plus Platform).
PARTS:
• • 1 x Rear Base Member
• • 2 x T-Nuts
PARTS:
• • 6 x M8 45mm Bolts
B)
• • 6 x M8 Washers
PARTS:
• • 1 x Motion Plus Pivot Bar
• • 4 x M8 20mm Bolts (Included with
Motion Plus Platform)
• • 4 x M8 Washers (Included with
Motion Plus Platform)
Tip: Use Spanner tool included
with the Motion Plus Platform.
50
(T-NUT POSITIONS)
105
Install 1 x T-Nut into the bottom channel of the Left and Right Base Members.
106
Align the mounting holes on the Motion Brackets (Included with Motion Plus) with the threaded holes on the
Motion Plus. Bolt through and secure with 10 x M8 Low Profile Bolts (Included with Motion Plus).
107
Align the mounting holes on the Motion Bracket with the T-Nuts installed in Step 01, 02, and 105. Bolt
through and secure with 4 x M8 Bolts and Washers.
Video Instruction: bit.ly/nlrbuild
PARTS:
• • 2 x T-Nuts
PARTS:
• • 1 x Motion Plus
• • 2 x Motion Plus Brackets
• • 10 x Motion Plus Mounting
Hardware
PARTS:
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
51