Herunterladen Diese Seite drucken

Dimplex LI 16I-TUR Montage- Und Gebrauchsanweisungen Seite 30

Vorschau ausblenden Andere Handbücher für LI 16I-TUR:

Werbung

English
CAUTION!
The transport securing device is to be removed prior to
commissioning.
For easier transportation into existing homes/buildings, it is
possible to separate the basic device into two parts.
Once the covering panels have been removed, please proceed
as follows:
1)
Drain refrigerant
2)
Remove condensate hose
3)
Remove the pipe insulation above the soldering points
4)
Separate 4x soldering points chip-free.
5)
Disconnect cables at the fan and pull through the
cable glands in the condensate tray.
6)
Unfasten 4x screws in the corners in each case
7)
Lift down the top part of the heat pump
8)
Areas for lifting on the frame
9)
Transport heat pump to the installation location
10) Join the parts
11) Re-solder the separation points again (with inert gas flush-
ing)
12) Evacuate the refrigeration circuit
13) Add refrigerant
14) Perform leakage tightness test
15) Re-attach pipe insulation
16) Re-connect fan
17) Bores for attaching a transport aid (e.g. lifting straps etc.)
CAUTION!
Do not lift by the condensate tray. This cannot withstand any
forces.
CAUTION!
Work on the refrigeration circuit and electrics may only be
performed by competent experts.
CAUTION!
The condensate hose must be removed before the upper part
is put down.
EN-6
Remove/screw in
transport lock
452169.66.06b · FD 0411
8
D
17
LI 16I-TUR
2
3+4
7
6
www.dimplex.de

Werbung

loading