4
MACHINE INSTALLATION
4.1 Preparation for installation
• Place the machine on an even and stable surface.
• Ensure that the machine is on a water-resistant surface in case of water spillage or
leakage.
• Do not place the machine on hot surfaces.
4.2 Electrical connection
• Ensure that the local main voltage supply corresponds to the information on the
machine label on the front panel of the espresso machine.
• Ensure that you use the correct power plug for your country.
• Plug the machine into a grounded socket only and do not leave it unattended.
• Do not roll or bend the power cord.
• Do not use a power extension cord or a multiple socket.
5
FIRST USE
Read the instruction manual carefully prior to operating the machine.
Prior to starting the machine, check if:
• the steam and hot water valves are closed.
• the machine is switched off. (Power switch in lower position.)
• the power cord is disconnected.
• the drip tray is inserted correctly.
• the machine is placed on a water resistant surface.
Now you can start up your machine:
1
Open the cup warmer tray.
2
Remove the water tank and rinse thoroughly.
3
Fill the water tank with fresh water low in lime, place it back and close the cup warmer tray.
PRO 400: Set the metal toggle switch to "ON" (indicated by the green LED lighting up).
JUMP: Press the on/off switch to turn on the machine (indicated by the LED ring lighting up).
The machine is now on.
4
The pump will start up and fill the machine's boiler with fresh water.
JUMP: The display shows the current settings for preinfusion (Pi), ECO mode (Eco) and temperature
unit (°C or °F) and then switches to regular operation.
5
As soon as the boiler has finished filling, you will no longer hear any pump noise. As soon as the fresh
water drops below a certain level in the fresh water tank,
PRO 400: the machine switches off electrically and the green LED flashes.
JUMP: The display shows "tAn".
You now need to top up with fresh water. The machine heats up automatically.
6
As a large amount of water is required when first filling the boiler, the water tank will need to be
refilled with fresh water.
7
Wait until the boiler pressure (indicated on the upper part of the gauge) shows 1.0-1.5 bar.
8
A manual "boiler ventilation" is not necessary because the PRO 400 and the JUMP is equipped with a
professional depression valve that ventilates the boiler during the heating phase.
9
Move the brew group lever into the upper position and dispense approx. 250 ml of water. The heat
exchanger will be filled with water and the circulation of the water in the thermosyphon system begins.
10 Move the brew group lever into the lower position. Refill the water tank if necessary.
11
The machine is now ready for use. Place the cups on the cup heater tray to preheat them and enjoy
your coffee.
Before making the first coffee, please rinse the machine by extracting about 2-3 water tanks
worth from the brew group and the hot water wand. See also chapter 6.9.1 Dispensing of hot
water
Translation of the original German user manual
ENGLISH
35