Herunterladen Diese Seite drucken

Toshiba V-856G Service Seite 91

Werbung

<Preparation for Loading drive assembly mounting >
a)
b
~~
c)
d
Sar
e)
Confirm that the head cleaner assembly is removed.
Confirm that the small hole b) on the cam gear aligns
with the hole on the mechanical deck.
Confirm that the clearance between the pinch lever
assembly and the cam gear is approx. 0.3 mm.
(Confirm that the pinch lever assembly is correctly
mounted on the groove of the cam gear.)
Confirm that the clearance between the drive lever and
the cam gear is approx. 2 mm. (Confirm that the drive
lever is correctly mounted on the groove of the cam
gear.)
Confirm that the A mark on the rotor of the cam
switch aligns with the A mark on the motor bracket.
. After completion above steps a) to e), mount the
loading drive assembly. Push four claws to the motor
bracket in the order of (d) — (c) > (b) — (a) and push
the portion (A) (No. 8 guide cap) into the motor
bracket.
Confirm that the A mark on the rotor of the cam
switch aligns with that on the bracket when the hole b)
on the cam gear aligns with the hole on the mechani-
cal deck. If the alignment of the A marks cannot be
confirmed, remove loading drive assembly once again
and reinstall after confirming the above steps a) to e).
Mount two flat cables.
Mount the F/L ground plate and the head cleaner
assembly.
2-25
Cam gear
Drive lever
Loading drive assembly bottom side
Fig. 6-29-3

Werbung

loading