Herunterladen Diese Seite drucken

Toshiba V-856G Service Seite 90

Werbung

1-6-27. Hook Replacement
1. Remove the hook lever assembly. (Refer to item "1-6-
26. Hook Lever Assembly Replacement".)
. Turn over the hook lever assembly (1) and remove the
hook lever assembly (1) opening the portion (A) of the
hook (2) slightly and lifting the hook (2) upward.
3. When mounting a new hook, push the hook (2) in the
portion (B) from above.
Note:
* Take care not to confuse the mounting direction of the
hook (2).
Portion (A)
Hook lever
assembly (1)
Fig. 6-27-1
1-6-28. Tension Drive Lever Replacement
1. Remove the cam slider. (Refer to item "1-6-41. Cam
Slider Replacement".)
2. Turn over the mechanical deck and remove the tension
drive lever (1) from the projection (A) moving
counterclockwise slightly.
3.
After replacing the tension drive lever (1) , mount in
the reverse order of removal.
Note:
* For the cam slider mounting, refer to the notes in item
1-6-4].
Mechanical deck
(Bottom side) Pc
Projection (A)
Tension
drive lever (1)
Fig. 6-28-1
2-24
1-6-29. Loading Drive Assembly Replacement
1. Remove the F/L ground plate and the head cleaner
assembly. (Refer to item "1-6-14. Head Cleaner
Assembly Replacement'.)
Remove two flat cables (1) from the connectors.
3. Pull out the portion (A) (No. 8 guide cap) from the
motor bracket (2).
Remove four claws (a), (b), (c), (d) securing the motor
bracket in the order of (a) — (b) > (c) > (d).
Flat cable (1)
FL groundplate
— Claw (a)
Claw (b)
i
——
N
Claw (c)
Portion (A)
(No.8 guide cap)
Motor bracket (2)
Fig. 6-29-1
Note:
* Remove the claw (a) inserting a driver.
¢ Remove the claws (b) and (c) pushin; inside previ-
ously and opening the claws slightly.
Claw
=a
Fig. 6-29-2

Werbung

loading