Herunterladen Diese Seite drucken

CGS XT-T1 Betriebsanleitung Seite 97

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.2 Setup
5.2.1 Connection plan XT-T1
Item
Earth connection
Power supply
Alarm output
Fuse
Fuse
Heating cable 1 - 4
6 Assembly
6.1 Assembly information
The installation and assembly must be done by CGS - service technicians.
In exceptional cases, the installation can be performed by CGS trained staff.
In any case, here the valid accident prevention regulations must be observed.
After the setup, installation, commissioning and test run of the unit, operation shall be done by trained
Persons.
Product:
Temperature controller XT-T1
Mark
Description
Grounding of the module with 10 mm²
XS-N1
Power supply 230 V
XS-S1
Alarm output at current heating circuit
F1
Fuse for the internal control system
F2 - F5
Fuse for the current heating circuit
XS-L1 - XS-L4
Electrical heating line connection 1 -4
Revision 2.0 – Issue September 2018
E
97/166

Werbung

loading

Verwandte Produkte für CGS XT-T1