Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Operation General - probst QUICKJET QJ-600-E Betriebsanleitung

Vorschau ausblenden Andere Handbücher für QUICKJET QJ-600-E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Operation

5
Operation
5.1

Operation general

If the device is operated with a mains power supply, the mains power cable must be attached to the power
cable holder (1) provided for this purpose on the operating handle (4) (see Fig. 01)!
To ensure that the plug connection of the mains power cable is secured against unintentional disconnection
(e.g. by unintentionally stepping on the cable with the consequence: vacuum missing load falling).
If you set down the unit with the motor running, take care not to place it on an airtight surface, since this will
block the flow of cooling air. Instead, place the unit on a support (such as a block of wood).
Always switch off the device if you do not intend to use it again within two minutes.
Before suction, remove any water from the suction surface. After each suction and laying down of damp
loads, the vacuum lifting device must be operated for at least 3 minutes with the ventilation flap open (free
suction without load) to remove any moisture that may be inside the vacuum system.
15. 1. Position the power cable (3), coming from
the blower unit at the hand grip ().
17. To adjust the hand grip () to the desired
working height,
52400045 / 52400049
16. Remove the mains power cable from power
cable holder (1) and also the cable socket (2)
from the cable connector (3).
18. pull out both spring bolts a little (right and
left of the device) then turn and release
them again until they engage.
22 / 29
Fig. 01
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Quickjet qj-600-e-110

Inhaltsverzeichnis