Herunterladen Inhalt Inhalt Diese Seite drucken

Stone Formations - probst HVZ-ECO Betriebsanleitung

Hydraulische verlegezange für den universellen baggereinsatz
Vorschau ausblenden Andere Handbücher für HVZ-ECO:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

General
4.2

Stone formations

1.) The stone formations 1 – 20 shown
below are suitable among others for
mechanical installation. Other stone
formations can also be laid by machines as
long as the stones are packed in the
correct formation ready for the machine to
lay them.
2.) The stone formations 16 – 20 are
suitable for mechanical installation by the
shifting adapter PA (4140.0003).
3.) The stone formations 21 – 25 are
suitable for mechanical installation by
special adapter.
Special adapters SA for installation units 21–24 or similar are available on request (indicate stone formation).
The device is only designed for the use specified in this documentation.
Every other use is not authorized and is forbidden!
All relevant safety regulations, corresponding legal regulations, especially regulations of the declaration of
conformity, and additional local health and safety regulations have to be observed.
Prior to every operation the user must ensure that:
the equipment is suited to the intended operation, the functioning and the working condition of the
equipment is examined, and the loads are suitable to be handled.
Any doubts about instructions should be raised with the manufacturer prior to use.
51400034
V3
11 / 41
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5140.0034

Inhaltsverzeichnis