Herunterladen Inhalt Inhalt Diese Seite drucken

10. Assembling The Main Cabinet To The Cabinet Base; Installing The Cooking Components - Pit Boss 3 Serie Montage- Und Betriebsanleitung

Digitaler elektrischer raucher
Vorschau ausblenden Andere Handbücher für 3 Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 67

10. ASSEMBLING THE MAIN CABINET TO THE CABINET BASE

Parts Required:
Temperature Probe Bracket (#18)
1
x
#10–24x½" Screw (#C)
6
x
2
x
#5–32x½" Screw (#F)
Installation:
Prepare the main cabinet to be mounted to the cabinet base. Position
the cabinet base next to the main cabinet, with both facing the same
direction. Lock the caster wheels on the cabinet base. Carefully, lift
the main cabinet onto the cabinet base. Secure the main cabinet to the
cabinet base using six screws (#C). Note illustration 10A.
At the rear wall, along the bottom edge of the main cabinet, locate the
temperature probe. Secure the temperature probe into place with the
temperature probe bracket using two screws (#F). Note 10B.
IMPORTANT: Once the temperature probe bracket is secure,
ensure the stainless steel tip extends above the lip of the lower
cabinet. This reads the internal temperature of the main cabinet.
Incorrect placement of the temperature probe may result in wrong
temperature readings on the Control Board.

11. INSTALLING THE COOKING COMPONENTS

Parts Required:
8
x
Cooking Grid Support Brackets (#2)
4
x
Cooking Grids (#1)
1
x
Water Pan (#12)
1
x
Water Pan Support (#13)
Installation:
Insert the water pan support into the bottom of the main interior
cabinet, then sit the water pan in the support. Note 11A.
NOTE: Keep water in the water pan at all times while cooking. It will
catch grease and drippings from your cooks and allow for easier
clean up. If smoking for an extended period, move water pan up
higher to allow water to last longer.
Next, insert eight cooking grid support brackets into the holes along
the inside walls of the interior main cabinet. Once positioned in the
holes, tilt downward to secure into position. Repeat the same process,
matching the same heights, for the right-side wall. Note 11B.
Lastly, place the cooking grids on the grid support brackets inside the
main cabinet. Note 11C.
CAUTION: To change the height between each cooking grid, adjust
only when the smoker is completely cooled to avoid injury.
10A
10B
18
11
11B
11A
9
11C
9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pbv3du1

Inhaltsverzeichnis