ECOLAB DOS ECO Kurz- Betriebsanleitung Seite 104

Dosierstation mit eco pumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.
Start the pump
Ä Chapter 5.2.2 'Switching the pump on and off' on page 45).
(see
5.
If a suction lance is present: Check that the empty signal is functioning.
6.
Vent the metering pump using the multifunction valve vent function and set the multi-
function valve according to the process conditions.
7.
If a suction lance is present: Position the suction lance in the supply tank. To prevent
the intake of air, fully immerse the suction lance in the test medium.
8.
Completely fill the system with the test medium
Ä Chapter 5.2.5 'Putting the metering station into operation' on page 50.
(
9.
Check that all safety components are set and functioning according to the
characteristics of the system: For example, the overflow function, flow monitoring
function and level monitoring function.
10. Check the entire system for leaks (visual inspection).
11. If you detect any leaks, switch off the metering station and rectify the leaks
immediately.
12. Allow the test medium to drain completely from the system by opening the pipework
connections.
5.1.3
Prepare the metering station for productive operation
Proceed as follows:
1.
Connect the metering medium to the metering station.
2.
If a suction lance is present: Position the suction lance in the supply tank. To prevent
the intake of air, fully immerse the suction lance in the metering medium.
3.
Ä Chapter 5.2.1 'Switching the metering station on and off' on page 45.
4.
Power up the entire system by activating the system control.
Ä Chapter 5.2.4 'Starting and stopping the metering pump' on page 50.
5.
6.
Completely fill the system with the metering medium
Ä Chapter 5.2.5 'Putting the metering station into operation' on page 50).
(see
5.1.4
Set the operating condition of the components
Utilise the following descriptions:
Ä Chapter 1.7.3 'Piping and instrumentation diagram' on page 17
n
Ä Chapter 4 'Setup, assembly and installation' on page 35
n
Ä Chapter 5.1 'Initial commissioning' on page 42)
n
All component settings (operating parameters) must conform to the technical data in the
relevant operating instructions for the components.
– Recommissioning after flushing, malfunction or temporary shutdown.
– Start dosing station after flushing / maintenance.
– Put the dosing station into operation after troubleshooting.
– Start the dosing station after a long shutdown.
Comissioning and operation
43
417101656 Rev. 01-10.2019