Herunterladen Inhalt Inhalt Diese Seite drucken

Burgbad RL40 Montageanleitung Seite 3

Led-spiegelschrank
Vorschau ausblenden Andere Handbücher für RL40:
Inhaltsverzeichnis
ASSEMBLY INSTRUCTIONS
GB
Below you will nd important information for installing and handling bathroom furniture, as well as safety instructions. It is
essential that you read and make note of these before installing the furniture. We can accept no responsibility for damages that
are the result of failure to adhere to these instructions.
1. Our products may only be installed by a specialist craftsman for sanitary facilities or by another competent person.
2. If you notice damage on the products, they should still be installed. If a part cannot be installed due to signi cant damage,
all preparations for installation should still be made and the installation rails, hooks and hanger bolts should be attached.
Our factory customer service does not undertake drilling.
3. The fastening materials (screws, wall plugs) are designed for solid, suf ciently load-bearing walls. In other installation
situations, special fastenings must be used accordingly. Hanger bolts are not included in the delivery!
4. Do not remove the protective lm until the furniture set has been fully installed. Vacuum up or rinse off any drilling dust; never
wipe it from the washbasin. Do not place any tools or sharp-edged or heavy objects on the washbasin.
5. High gloss surfaces are fully hardened within three weeks of the protective lm being removed. Please treat them with
particular care during this period and do not clean or wipe them (no micro ber cloth).
6. No drilling dust can be allowed onto the pull-out rails! Furniture should therefore only be hung after drilling, or taken down
again before drilling.
7. The products must be attached at all the installation points provided.
8. The installation dimensions refer to the top edge of nished ooring. All dimensions in mm.
9. Electrical installations may only be conducted by a specialist, taking DIN 57100/VDE 0100 Part 701 into account. Plug
connections, lighting and sockets must be checked.
10. Doors and drawers must be adjusted after installation. This subsequent adjustment is part of normal maintenance depending
on the use and loading of the items of furniture and is not a reason for complaint.
11. Please clean the furniture before handover! Remove drilling dust, labels and adhesive residues!
12. Check the water and siphon connections for tightness!
13. Silicon joints are to be used on the back edge of the washbasin, the side connections of the furniture and to connect the
washbasin with the washbasin substructure in order to prevent water penetration. Use only neutrally bonded (solvent-free)
silicon.
14. The function, handling and care of the products must be explained to the owner.
15. Drywalls and plasterboard walls must have an adequate load bearing capacity.
DE
EN
3
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

M1207

Inhaltsverzeichnis