Herunterladen Inhalt Inhalt Diese Seite drucken

Monthly Maintenance; External Maintenance; Ceramill Coolstream; Half-Yearly Maintenance - Amann Girrbach ceramill motion 2 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für ceramill motion 2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
9.1.4

Monthly Maintenance

Checking the zero point
It is recommended to check the zero point once
every month.
▷ Mill a test cube from the Ceramill TEST 71 L test
blank.
The test blank is to be used exclusively for test
milling and calibration of the Ceramill Motion 2.
The corresponding instructions are on the
Ceramill Match CD or available on our website
under
www.ceramill-m-center.com
Jäger spindle
The spindle must be in the starting position.
▷ Manually turn the shaft of the spindle through
(at least ten times).
Fig. 36 Turning the Jäger spindle through
For further information on the Jäger spindle,
please download the Manual from our website
www.amanngirrbach.com
under
C L E A N I N G A N D M A I N T E N A N C E
9.1.5
External maintenance is necessary after 1000
operating hours. The Ceramill Motion 2 software
will inform you appropriately.
▷ Contacting the Ceramill helpdesk (workdays
from 8 a.m. to 5 p.m.).
▪ Germany: +49 7231 957 100
▪ Austria: +43 5523 62333 390
▪ International: +43 5523 62333 399
▪ helpdesk@amanngirrbach.com
9.2
.
9.2.1
Regular inspections:
_ Condition of the hoses and drain pipes
_ Filling level of the C/L in the supply unit of the

Ceramill Coolstream

9.2.2 Weekly Maintenance
▷ Analyse the C/L (see separate analysis instruc-
.
tions with test record).

9.2.3 Half-yearly Maintenance

▷ Clean the C/L system (please refer to page 80).

External Maintenance

Ceramill Coolstream
Inspections and Maintenance Measures
When the filling level in the C/L container
has fallen below the minimum level, the
milling program is interrupted and an
error message is indicated.
▷ Refill the C/L container (please refer to
page 79).
▷ Acknowledge the error in the software.
The half-yearly cleaning is indicated via
the program. After activation of the sys-
tem to be cleaned, the indication is omit-
ted again.
E N
85

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ceramill coolstream

Inhaltsverzeichnis