Herunterladen Inhalt Inhalt Diese Seite drucken

Amann Girrbach ceramill motion 2 Betriebsanleitung Seite 66

Vorschau ausblenden Andere Handbücher für ceramill motion 2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
I N S T A L L A T I O N
5.5
Starting-up the Ceramill Motion 2
E N
The three standard cutters in tool stations
1-3 are mandatory for operation.
In addition to standard tools, sister tools can
optionally be inserted in the tool holder. When a
standard tool has reached its wear limit, the
Ceramill Motion 2 automatically accesses the
respective sister tool.
Fig. 15 Tool holder (five-axis model)
On the four-axis model, the tool holder is
turned by 90° (see figure 2 on page 52).
▷ Insert the Ceramill Motion Roto standard tools
into the tool holder of the Ceramill Motion 2.
Position the tool shank facing toward the out-
side.
▪ Roto 2.5 is in the spindle.
▪ Set Roto 1.0 to position 2.
▪ Set Roto 0.6 to position 3.
▷ Optional: Insert the sister tools into the tool
holder of the Ceramill Motion 2. Position the
tool shank facing toward the outside.
▪ Set Roto 2.5 to position 4.
▪ Set Roto 1.0 to position 5.
▪ Set Roto 0.6 to position 6.
66
▷ Insert the desired blank into the holder in the
Ceramill Motion 2. The high/thick side of the
blank must face the spindle.
Fig. 16 Inserting a blank (five-axis model)
▷ Fasten the blank using four screws and washers.
NOTE:
Do not damage the blank!
▷ Do not overtighten the screws! Avoid mechan-
ical stress!
▷ Tighten the screws with the Allen key provided.
Fig. 17 Tightening a blank (five-axis model)
▷ Mount the respective hood.
▪ The extraction hood for dry processing
▪ The splash guard for wet processing

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Amann Girrbach ceramill motion 2

Diese Anleitung auch für:

Ceramill coolstream

Inhaltsverzeichnis