7. Operation
7.1. First Commissioning
7.2. Firing
style appliances
85
Instruction manual
Remove all provided documents and accessories from
the fireplace.
Please carefully read the operation instructions. Com-
plete the guarantee card attached to the operation set
and send it back to the company Rüegg.
First commissioning of your fireplace should be per-
formed 4 weeks upon completion of the facing at the
earliest allowing all facing components to dry com-
pletely.
The first fire should be kept very small within the first
hour, then the amount of wood fed into the fireplace
may be increased slowly. The maximum amount of
wood fed into the fireplace per hour may also not be
exceeded at a later point in time.
During the first couple of fires of your installation,
some unpleasant odours may appear caused by the
evaporation of some binding agents in the paint.
Please open all windows near to the fireplace to
aerate the room!
Pull out handle of the combustion air shutter com-
pletely (style appliances) or turn it to the very right.
Completely open throttle valve, if any.
Pile up a permissible amount of firewood with firing
module.
Place firing module composing of 4-6 dry, fine pieces
of wood (fir wood) and 1-2 firelighters, e.g. wax-
soaked wood wool, on the firewood stack. (burning
down from top to bottom!)
Light up firelighter. Close door.
After approx. 5 min., close combustion air shutter by
50% (push handle or turn it to the left).
After approx. 5 min., close throttle valve, if any, by
50% (turn handle to the left).