Commissioning
74
6
Commissioning
6.1
Installation check
Before commissioning the measurement point make sure that all final checks have been carried out:
• Checklist "Installation check"
• "Connection check"
6.2
Switch on the device
Once the power has been connected, the field transmitter is operational.
6.3
Quick Setup
Using the Quick Setup the operator is led through all the most important unit functions, which must
be set up for standard measurement operation of the unit.
Standard setup
®
Available in ReadWin
2000, HART
7
DXR275/375 (Symbol
), Commuwin II with Matrix address
Function mode
PV mode
PV unit
Sensor 1
Sensor type
Sensor connection
Measuring unit
Sensor 2
Sensor type
Sensor connection
Measuring unit
Output
PV lower range value
PV upper range value
Safety settings
Fault condition
Ambient alert
®
handheld module
ReadWin
2000
+
+
+
+
+
+
+
+
+
+
+
+
+
TMT162
7
®
/FieldCare
CW II-Matrix
+
V1H1
+
V1H2
+
V1H3
+
V3H0
+
V3H1
+
V3H6
+
V4H0
+
V4H1
+
V4H6
+
V1H4
+
V1H5
+
V1H8
+
V2H2
Endress+Hauser