Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Set-Up Location And Connection Specifications - Kessel SE NS 2 Bedienungsanleitung

Fettabscheider zur selbstentsorgung mit manueller entsorgungseinrichtung
Inhaltsverzeichnis

Werbung

3

Installation

3.1

Set-up location and connection specifications

Well vented or ventilated room and one with level set-up area.
Room temperature at least 15°C constant / max. 35°C, guaranteed
frost-free.
Room height at least 60 cm higher than the height of the system so
that the inspection covers can be opened during cleaning work.
Free space to work at least 1 m all way round the system, at least
60 cm above the system.
Inlet with stilling section of at least "DN of the inlet pipe" x 10
(gradient 2%). Transition from on-site drainpipe to stilling section
equipped with 2 x 45° bends
Objects (cutlery, crown corks, mustard sachets, bones etc.) interfe-
re with separating operation and can damage the flushing pump.
To protect the system from improper operation, the coarse filter
must be switched upstream of the separator.
Route on-site pipes at a distance of 30 cm to the mixer motor <40>
so that free access is possible during maintenance work.
Floor tiles with drain (recommended)
Hot water connection in the system set-up room (recommendation)
Necessary venting connections
Connect venting hose for heating mantle <36>
Scoring surface on the rear of the balance tower <83> . Vent with
at least size DN 70 via the roof.
If the inlet pipe <16> is longer than 10 m it must be vented
separately.
1) Reduction of the danger of siphons and odour traps being suctioned dry Less entry and movement of air as well as formation of odours
and foam in the separator.
010-913
Installation
.
1
48 / 108
83
36
16
Ill. [4]
40
35
2017/10

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis