Herunterladen Inhalt Inhalt Diese Seite drucken

Tefcold BLC3AX1 Benutzerhandbuch Seite 254

Schockfroster /gefrierschrank
Inhaltsverzeichnis
EVCO S.p.A.
PAR.
DEFAULT
r0
2
r1
90
r2
240
r3
3
r4
-18
r5
90
r6
240
r7
0
r8
-40
r9
-20
r10
2
r11
-20
r12
5
r13
15
r14
60
r15
65
r17
5
r18
80
r19
-40
MIN.
MAX.
U.M.
(1)
1
15
°C/°F
1
500
min
1
500
min
(1)
-50
99
°C/°F
(1)
-50
99
°C/°F
1
500
min
1
500
min
(1)
-50
99
°C/°F
(1)
-50
99
°C/°F
(1)
-50
99
°C/°F
(1)
-50
99
°C/°F
(1)
-50
99
°C/°F
(1)
-50
99
°C/°F
(1)
-50
99
°C/°F
10
100
%
(1)
-50
199
°C/°F
(1)
0
99
°C/°F
10
999
s
(1)
-50
+99
°C/°F
Vcolor 869/879 | Installer manual ver. 4.0 | Code 144VC869E404
MAIN REGULATOR
Cabinet set point differential in blast chilling, blast-freezing,
sanitation, ice cream hardening and customized cycles.
Duration of time controlled blast chilling
Duration of time controlled blast-freezing
Product temperature to end temperature controlled blast
chilling and to end the soft phase in temperature controlled
soft blast-freezing.See also parameter r5
Product temperature to end temperature controlled blast-
freezing. See also parameter r6.
Maximum permitted duration for temperature controlled blast
chilling. See also parameter r3
Maximum permitted duration for temperature controlled blast-
freezing. See also parameter r4
Cabinet temperature set point during blast chilling and the soft
phase of soft blast-freezing. See also parameter r0
Cabinet temperature set point during blast-freezing and ice
cream hardening. See also parameter r0.
Cabinet temperature set point during the hard phase of hard
blast chilling. See also parameter r0.
Cabinet temperature set point during conservation after blast
chilling, hard blast chilling and continuous cycle. See also
parameter r0
Cabinet temperature set point during conservation after blast-
freezing and soft blast-freezing. See also parameter r0
Cabinet temperature set point during pre-cooling. See also
parameter r0
Product temperature to end the hard phase of hard
temperature controlled blast chilling.
Duration of the hard phase of hard time controlled blast
chilling (i.e. the percentage of the value set by parameter r1).
Duration of the soft phase of time controlled soft blast-freezing
(i.e. the percentage of the value set by parameter r2)
Product temperature below which the count for maximum
duration begins for temperature controlled blast chilling or
blast-freezing.
Minimum gap between the product and cabinet temperatures,
according to which the first phase of the test for correct
insertion of the needle probe is considered successfully
completed
0
= the test is disabled and the needle probe is considered
always inserted
Duration of the second phase of the test for correct insertion
of the needle probe.
Cabinet temperature set point for the first phase of sanitation.
page 71 of 96
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Blc5ax1Blc10ax1Blc14ax1

Inhaltsverzeichnis