4.3.1
Preparing Atlan for coupling to a ceiling supply unit
4.3.1.1
Removing the cable ducts
1. Remove the eight M4x10 screws (1). Remove the cable ducts (2).
4.3.1.2
Laying the cable
1. Insert the 85 mm standard rail for the channel (3) into the vertical profile rail of
the device. Bring it to the appropriate height (see illustration) and screw it tight.
Tightening torque: 9 Nm ±10 %
2. Route the corresponding cables around the standard rail. Secure them with a
cable tie (4).
|
Kit
Atlan A3xx SW 2.0n ceiling-mounted versions
Connecting Atlan to the Ambia ceiling supply unit
|
33